Within the past month, I have been working non-stop, more or less. I have already pulled close to all-nighters, staying up until 4:00am and 5:30am, and having a normal bedtime of 2am.
Design: The next project (project 3) we did was with the De Stijl Movement, focusing on Mondrian. We had to take one of his paintings, and make a 3D Model of it. I loved that project! We then briefly did a color wheel project that lasted a week. It was cool. AND, now, we are doing a project in which we have a painting that we must abstract into a 3D object/sculpture. This project with the painting is sooooo hard, but, definitely very interesting.
Drawing: We had a portfolio review last week. It went pretty well. We had some pretty hard projects that took a lot of time but turned out well, such as the postcards and self portraits.
Anyways, sorry for the brief post. SO MUCH HOMEWORK! Review for Project 5 is this week.
Design: The next project (project 3) we did was with the De Stijl Movement, focusing on Mondrian. We had to take one of his paintings, and make a 3D Model of it. I loved that project! We then briefly did a color wheel project that lasted a week. It was cool. AND, now, we are doing a project in which we have a painting that we must abstract into a 3D object/sculpture. This project with the painting is sooooo hard, but, definitely very interesting.
Drawing: We had a portfolio review last week. It went pretty well. We had some pretty hard projects that took a lot of time but turned out well, such as the postcards and self portraits.
Anyways, sorry for the brief post. SO MUCH HOMEWORK! Review for Project 5 is this week.